Interactive image-to-build demonstration
Give us the image.
See the build logic.
Explore how an approved visual can become an engineering starting point: visible forms are organized into components, an exploded view, an assembly sequence and a draft bill of materials.
A-01 · FRP formA-02 · FRP formB-01 · plinthL-01 · light/signStart the analysis to generate a structured preview.
The first pass will identify likely components and expose the questions an engineer must resolve before quotation or production.
Draft bill of materials
What the system organizes.
Each visible element becomes a reviewable work package. Material, process, quantity and confidence stay connected to the source image and later revisions.
An interactive illustration of FORMERA's intended image-to-engineering workflow.
What it is notAn approved production drawing, structural calculation, final BOM or binding quotation. Formal release requires project inputs and engineer review.